[ARCHIVED] Construction for the Week of July 15th

Interactive Construction Updates Map

Highway Division Updates

  • Last week, the Highway Division:
    • Applied asphalt overlays to Allen Place, Clement Street, Dunphy Drive, Fort Street, Norwood Avenue, Riverside Drive, Ryan Road, Trumbull Road and Woods Road
    • Regraded Old Springfield Road
    • Repaired driveway aprons on Allen Place, Blackberry Lane and Manhan Street
    • Resurfaced Manhan Street to correct drainage issues
    • Repaired road edge on Fort Street
    • Replaced signs on North Street & Sylvester Road and at Musante Beach
  • Federal Street is reduced to one lane at the culvert crossing between Milton Street and Vernon Street until further notice
  • Lovefield Street remains closed until further notice
  • Annual ward street sweeping operations continue in Ward 6
  • To report a pothole, please submit a request via the Pothole Repair Form; the largest potholes are filled first to alleviate hazards to vehicles; as hazards arise and are identified, they will be addressed
  • To report an issue with a traffic sign, please submit a request via the Traffic Sign Issue Form

Adare Place Outfall Reconstruction

  • The City has contracted with Mass-West Construction, Inc. to reconstruct a drainage outfall along the Mass Central Rail Trail near Adare Place
  • The project is complete and the rail trail is open
  • The Contractor will demobilize this week

Damon Road Reconstruction

  • MassDOT has contracted with Gagliarducci Construction, Inc. to reconstruct Damon Road from the bike path to just beyond the intersection with Bridge Road, King Street and North King Street
  • The project will provide intersection and traffic signal improvements, extended sidewalks, a shared use path and other safety improvements
  • The project is scheduled to be completed by December 2024
  • This week, the Contractor will:
    • Pave Damon Road, between King Street and railroad crossing, on Monday & Tuesday
    • Install curb & sidewalk at Damon Road/King Street intersection and on Damon Road, between King Street and railroad crossing; travel may be reduced to one lane on Damon Road and North King Street during construction hours (7:00 a.m. to 3:30 p.m.)
  • Damon Road closure at railroad crossing continues through Monday, July 15th
  • Questions about the project should be directed to MassDOT District 2, project #608236

Dryads Green Extension Drainage & Slope Improvements

  • The City has contracted with Geeleher Enterprises Inc. to construct drainage and slope improvements from the end of Dryads Green Extension to the Mill River; work also includes roadway drainage improvements
  • The project is substantially complete
  • Minor site modifications will be installed in the coming weeks
  • Public Works will be on-site continuing post-construction observations throughout the summer

Green Street - Smith College Geothermal Project

  • Smith College is undertaking a campus-wide geothermal energy project
  • The project includes the installation of underground distribution piping across several City streets
  • Work on Green Street is ongoing and is anticipated to last until mid-August

I-91 Bridges over Route 5, the Railroad and Hockanum Road

  • MassDOT has contracted with J.F. White, Inc. to construct roadway improvements to I-91 and at Exit 23 (formerly Exit 18)
  • The project will replace the I-91 bridges over Route 5, the Railroad and Hockanum Road and construct safety and signal improvements at the exit interchange
  • The project is scheduled to be completed in phases by 2025
  • I-91 southbound:
    • Daytime left lane closure Monday through Friday this week, from 6:00 a.m. to 2:00 p.m., for median restoration
  • I-91 northbound:
    • No traffic impacts are anticipated this week
  • Route 5:
    • Daytime shoulder closure Monday through Friday this week, from 6:00 a.m. to 3:00 p.m., for retaining wall construction and curb & sidewalk installation; two-way traffic will be maintained at all times; a police detail will assist with traffic control
  • Hockanum Road:
    • No traffic impacts are anticipated this week
  • Questions about the project should be directed to MassDOT District 2, project #606552

Levee Toe Drain Improvements

  • The City has contracted with Ludlow Construction Co., Inc. for the installation of manholes along the land side of both the Connecticut and Mill River levee systems as well as video inspection of the toe drains running parallel to the levees
  • The City or the Contractor may be on site investigating drain issues around Hockanum Road this week

Levee Vegetation Management

  • The City has contracted with Cain’s Mechanical LLC for vegetation management at various locations throughout the levee and flood control system on both the Connecticut and Mill Rivers
  • Work to mechanically remove unwanted woody growth and fallen trees and localized placement of rip rap for slope stabilization will be undertaken periodically system wide throughout the growing season
  • The Contractor will resume mowing the levees this week

Pavement Improvements - Eversource Gas

  • Eversource Gas has contracted with Precise Paving to mill & overlay previously trenched & patched pavement segments throughout the City
  • This week, the Contractor will pave sections of:
    • South Park Terrace and South Street on Tuesday, July 16th
    • Elm Street, Federal Street, Forbes Avenue, Masonic Street, Maynard Street and Washington Place on Wednesday, July 17th

Pavement Resurfacing 2024

  • The City has contracted with Northeast Paving for paving on the following streets: Bridge Road, Burts Pit Road, Chestnut Street, Dana Street, Look Park roundabout, Loudville Road, North Elm Street, North Loudville Road, North Main Street, North Maple Street and Spring Street
  • The project also includes sidewalk reconstruction along several of the streets to be repaved and on North Main Street from Park Street to the roundabout, upgrades to curb ramps, new pavement markings, sign installation and speed hump & speed table installation (pdf) on Burts Pit Road, Meadow Street and Spring Street
  • See Construction Notice (pdf) for more information
  • Motorist should expect traffic delays; please seek alternate routes if possible
  • The Contractor will install tree protection and excavate the sidewalk on Spring Street and install tree protection on Chestnut Street this week

Rocky Hill Road (Route 66)

  • The City has contracted with Geeleher Enterprises Inc. to repair a drain pipe near the Hampshire Jail & HOC
  • Work also includes repairs to the east bound lane pavement, curbing and sidewalk
  • Work is scheduled to resume in the coming weeks

Rocky Hill Road, Ice Pond Outlet Improvements

  • The City has contracted with Flynn Enterprises, Inc. to construct improvements to Ice Pond on Rocky Hill Road including installation of a new outlet structure and a new access road
  • Site preparations, including vegetation clearing, were completed in Winter 2024
  • The Contractor will be working on the pond and outlet structure modifications this week
  • Project completion is anticipated in Fall 2024
  • Questions about the project should be directed to the Office of Planning & Sustainability

Sewer Lining

  • The City has contracted with National Water Main Cleaning Company for in situ lining of the sewer main on Cherry Street, Graves Avenue, Highland Avenue, Linden Street, Maplewood Terrace, Milton Street, Orchard Avenue, Ormond Drive, Union Street and Williams Street
  • The project includes cleaning and inspecting sewer lines followed by pipe lining utilizing a technique called ultraviolet-light cured in place pipe (UV-CIPP)
  • Brief disruptions to sewer service will occur during the process and notices will be handed out one (1) week in advance with a reminder notice 24 hours before any service impact
  • See Notice to Residents (pdf) for more information
  • Installation will run Monday through Friday, from 7:00 a.m. to 7:00 p.m.
  • A parking ban will be in effect and one-way alternating traffic will be maintained at all times with police/flagger details assisting with traffic control
  • The Contractor will resume lining this week; the schedule below is subject to change:
Dates
Locations
July 15th - 19thLinden Street
Milton Street
Ormond Drive
Union Street
Williams Street
July 29th - August 9th
Williams Street

An overview of all current Public Works projects can be found by going to Current Projects.

Sign up for automatic notifications via the Notify Me system on the City's website. Please sign-in (at the top of the page) and then subscribe to the "Public Works" category under News Flash (at the bottom of the page).


Facebook Twitter Email

Other News in Public Works

Annual Water Main Flushing

Posted on: March 30, 2026
City Seal Newsflash Image

Annual Water Quality Report

Posted on: March 11, 2026