Highway Division Update
- Last week, the Highway Division repaired potholes on Oak Street and Fern Street and repaired curbs on Acrebrook Drive, Drewson Drive, Austin Circle, Massasoit Street, Fourth Street, and Winter Street.
- To report a pothole, please submit a request for Pothole Repair. The largest potholes are filled first to alleviate hazards to vehicles. As hazards arise and are identified, they will be addressed.
- Street sweeping in Ward 1 has been completed.
- Street sweeping in Ward 6 will continue next week.
Burts Pit Road Paving Project
- The paving project is substantially complete.
- The Contractor will be working on guardrail installation and replacing select roadway signage.
Chesterfield Road, Spring Street, Main Street (Leeds), and Cross Street Paving Project
- On Spring Street, Main Street (Leeds), and Cross Street, the Contractor will continue working on structure adjustments (manholes and catch basins) and will begin work on driveway aprons.
- On Chesterfield Road, the Contractor will continue installing drainage improvements.
- Delays may occur and residents are encouraged to seek alternative routes, when possible.
Bridge Road and Glendale Road Paving Project
- On Bridge Road, the Contractor will continue work on driveway aprons and installing loam adjacent to curbs.
- On Glendale Road, the Contractor will work on structure adjustments (manholes and catch basins) and may begin work on driveway aprons.
Pavement Markings
- The City has contracted with Hi-Way Safety Systems to repaint pavement markings across the City. This includes double yellow center lines, white edge lines, speed hump markings, arrows, railroad markings, and crosswalks.
Clement Street Bridge
- The City has contracted with NEL Corp to remove and replace the Clement Street bridge deck protective surfacing and to repave 30 feet at the deck approaches.
- The bridge is expected to reopen by the end of September 2019.
Damon Road, Bridge Street, Exit 19
- MassDOT has contracted with Baltazar Contractors, Inc. to construct a roundabout and associated improvements to the Interstate 91 - Exit 19 interchange at the base of the Coolidge Bridge. The work is scheduled to be completed by June 2021.
- Preliminary work includes construction signage installation, survey, work on the northbound I-91 off ramp and utility relocations.
- Questions about the project should be directed to MassDOT District 2.
An overview of all current Public Works projects can be found by going to Current Projects.